Goods are delivered by trucks. Each hour arrives 8 trucks with goods. The average unloading time is 15 minutes. Each truck cost $24 per hour (I guess it is a waiting time). Also there are option to use an loader (machine). Loader's productivity is 12 trucks per hour and additional cost $2 per truckload.
Which method would be more effective and cheaper?

hope you understand my english.
Thank you.

-
I'm assuming that no truck has to wait for any other truck to be unloaded before beginning to unload. With that assumption, and the fact that it takes 1/4 hour to unload, the cost of manual unloading is 24/4 = $6.00 per truck. Using the loader, a truck can be unloaded in 1/12 hour with a lost time cost of 24/12 = $2.00 per truck plus a loader cost of $2.00 per truck for a total of $4.00 per truck for loader assisted unloading.

$6.00/truck for manual unloading
$4.00/truck for loader assisted unloading.

Looks obvious which is the more cost effective.