The sink of a lab bench is clogged and the water was left running on June 13th. The rate of flow is 10.0liters/minute. assuming no leaks, would the room be completely filled with water by July 1s. he volume of the room is 280.99m^3
-
10 liters a min is 14,400 liters per day. The room has 281,000 liters of volume. So it would take (281,000L/14,400 L/day) 19.51 days to fill the room. So the room would be filled sometime after July 1st, by a day and a half or so, depending on when the water was left on.